“Refit work on the CNS EBODJE warship at the Camroon Navy’s floating dock”
Continuing its extensive fleet maintenance programme,

the Cameroon Navy’s shipyard has just successfully completed the major refit of the coastal patrol vessel CNS EBODJE at the Navy’s floating dock.

 

 

The vessel was refloated on 25 July 2024, to the great satisfaction of the crew.

A la une

INSTALLATION DES CHEFS DE BUREAUX RÉCEMMENT NOMMÉS À L’ÉTAT-MAJOR DE LA MARINE

Le Contre-Amiral ADE NKWENTI Hilary, Major Général de la Marine, a procédé ce jour à l’installation des chefs...

FORMATION INITIALE AU COMBAT NAUTIQUE DE LA HUITIÈME VAGUE DES FORCES SPÉCIALES DU CAMEROUN (FS8 CMR)

L’École de Plongée et de l’Action de l’État en Mer (EPAEM) a accueilli, dans le cadre de la formation initiale...

INSTALLATION OF REAR ADMIRAL ADEKWENTI HILARY AS DEPUTY NAVY CHIEF OF STAFF

The Navy Chief of Staff, Vice-Admiral Mendoua Jean, presided over the installation ceremony of Rear-Admiral...